DOWNLOAD:

WT Instruction Sheet PDF

WT Installation Instructions

 

REMOVE ENOUGH JACKET AND ARMOR from the end of the cable to allow wire leads long enough to make connections to equipment.

 

Remove sufficient amount of jacket to allow for making a good grounding bond of the armor to connector.

 

OMIT THIS STEP IF NOT USING SLEEVE!* Slip heat shrinkable sleeve over cable before installing the connector into the equipment.  Do Not apply heat to sleeve at this time.

 

LOOSEN GLAND NUT without removing. Screw the connector onto the cable making sure it is tight enough to make a good bond. Tighten gland nut with channel locks or strap wrench until tight (gland firmly contacts PVC jacket on cable).

 

REMOVE THE LOCKNUT AND BUSHING. Install cable leads and connector thru knockout hole into equipment or box. Be sure seal ring is between connector body and outside of box. Reinstall locknut (with teeth pointing towards the connector) and bushing.

 

OMIT THIS STEP IF NOT USING SLEEVE! Slip heat shrinkable sleeve over cable and connector and apply heat to shrink the sleeve.

 

 

*Note: Heat shrinkable sleeves only protect the connector from corrosives, they are not necessary for water tightness.

 

specs

install WT

install WTU

(800) 535-6268

Shop our Products or call 817.535.6268, Visit us at 2000 MLK FRW, Fort Worth, TX, 76104

About Us

End Users

Copyright (c) 2014 American Connectors Inc.  All Rights Reserved.

Term of Use

Sitemap